A second storey addition in Sydney is a design and approvals project before it is a building project. The cost is shaped by decisions made on paper: whether the existing house can carry the load, where the stair goes, which approval pathway applies and how complete the drawings are when builders price them.
A second storey addition in Sydney is a design and approvals project before it is a building project. The cost is shaped by decisions made on paper: whether the existing house can carry the load, where the stair goes, which approval pathway applies and how complete the drawings are when builders price them. This guide walks through each of those in the order you will meet them.
Three checks come first, and none of them needs a builder yet.
Structure. A structural engineer needs to confirm what the existing footings and walls can carry. Full brick houses on good footings often take an upper level well. Brick veneer and timber-framed cottages can too, usually with new posts or beams threaded through the ground floor.
Planning controls. Your council's local environmental plan sets a maximum building height and, in many areas, a floor space ratio. Those two numbers decide how much upper floor is possible.
The site. Heritage conservation areas, bushfire prone land and neighbours close to the boundary all change what will be approved.
A Section 10.7 planning certificate from council lists most of the constraints that apply to your land.

The upper floor is the easy part. The ground floor is where the design is won or lost.
The stair takes real space, commonly the footprint of a small room, and it lands in the middle of the existing plan. Put it in the wrong place and you lose a bedroom downstairs to gain two upstairs. A good design uses the stair to reorganise the ground floor at the same time.
The other design problems are consistent across Sydney:
There are two routes in NSW. A complying development certificate, or CDC, is a fast-track approval issued by council or a registered certifier when the design meets every numeric standard in the State's housing code. A development application, or DA, is assessed by council on merit.
A CDC is quicker, and it is rigid. If the design misses one standard, it is not available. Sites in heritage conservation areas generally cannot use it for this kind of work, and nor can land with the highest bushfire ratings.
A DA takes longer and allows more. Council can approve a design that varies a control if the outcome is reasonable. The NSW Planning Portal explains both pathways, and all applications are lodged through it. Choosing the pathway is one of the first things we settle, because it changes how the DA and CDC documentation is prepared.

We do not publish build prices, because a figure without a design is a guess. What moves the cost is predictable:
Design and approval fees are separate from the build and far smaller. They are also where the build cost is controlled.
This is the caveat people do not expect from a firm that designs upper floor additions. Building up is often promoted as the economical way to add space. It frequently is not. Strengthening an old structure, removing a roof and working at height can cost more per square metre than a ground floor extension.
Going up makes sense when the block is small, when you want to keep the garden, or when a view or outlook justifies it. If you have yard to spare and no strong reason to keep it, a rear extension is usually simpler. We will tell you which one your site favours.
A common point of confusion, so to be clear: LCG Architects designs, documents and obtains approvals. We do not build. The team on a typical project looks like this:
Keeping those consultants working from one coordinated set of information is part of the additions and alterations service.
Expect months, not weeks. Measured survey, concept design, engineering input and documentation come first. A CDC can then be issued in a matter of weeks once the application is complete. A DA commonly takes several months, depending on the council and whether neighbours object.
The fastest projects are the ones where the brief is settled early. Changing the design after lodgement is what costs time.
Free, and useful to any designer you speak to:
Send us your address and a short note on what you need through our building design and drafting page. We will check the controls on your site and tell you whether going up is the right answer.
The cost depends on structural work to the existing house, the size and fit-out of the new floor, site access and the level of finish. No reliable figure exists without a design. The dependable way to get one is to have the design documented properly and priced by more than one builder.
Yes. A second storey addition needs either a complying development certificate or a development application followed by a construction certificate. Which one applies depends on whether the design meets the State's complying development standards and on site constraints such as heritage and bushfire.
Most can, but not all without significant work. A structural engineer must confirm the footings and walls can carry the added load or specify strengthening. Planning controls on height and floor space also limit what is possible on a given lot.
Usually for at least part of the build. The roof is removed and the ground floor is affected by structural work and the new stair. Some projects can be staged so the family stays, but it lengthens construction and is not comfortable.
An architect or building designer prepares the design and approval documents first, and builders then price the same set of drawings. Going to builders without drawings produces estimates that cannot be compared. Design and build companies combine both roles, which is convenient but removes competitive pricing.
Granny flat design in NSW explained. The size and lot rules, who designs, who approves and who builds, and what affects secondary dwelling design cost.
Read more → Dual occupancyDual occupancy design in Sydney starts with the block. What your lot needs, how approval works, what affects the cost and what a designer handles.
Read more → DADA vs CDC in NSW explained. How each approval pathway works, how long each takes, what CDC drawings need to show and which one suits your project.
Read more →